MORDOĞAN WPP / 13,8 MWe Egenda Ege Energy Production Co.

Company Information

Legal Entity

Egenda Ege Power Production Co.

Founded

14.03.1997

Investment Cost

63.421.694 TL/20.285.590 $

Capital

210.000.000 TL

Annual Production Capacity

42,95 GWh/Year

Installed Capacity

15 MWm / 13,8 MWe

Facility Type

Renewable

Energy Source

Wind

License Acquired

29.05.2008

Location (Province/District)

İzmir / Karaburun

Commercial Operation

24 June 2016

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

E82-E4/Enercon

Number of Units

5

Wind Category

II

Connection Type

MV