GERMİYAN WPP / 10.8 MWe Egenda Ege Energy Production Co.

Company Information

Legal Entity

Egenda Ege Power Production Co.

Founded

14.03.1997

Investment Cost

58.967.779 TL/18.605.750 $

Capital

210.000.000 TL

Annual Production Capacity

34,1 GWh/Year

Installed Capacity

12 MWm / 10,8 MWe

Facility Type

Renewable

Energy Source

Wind

License Acquired

29.05.2008

Location (Province/District)

İzmir / Çeşme

Commercial Operation

06 May 2016

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

E82-E2/Enercon

Number of Units

6

Wind Category

II

Connection Type

MV