Egenda Ege Power Production Co.
14.03.1997
72.472.380 TL/40.930.973 $
210.000.000 TL
78 GWh/Year
28 MWm / 27,2 MWe
Hydroelectric (River Type)
27.12.2007
Adana / Karaisalı
April 2013
Production / 49 Year
Francis (Vertical)/Flovel
3 (5,23 + 2 x 10,98 MWe)
169 m – 17,4 m3/sec
Substation 154 kV – 19.8 km