EĞLENCE I HPP / 43.5 MWe Egenda Ege Energy Production Co.

Company Information

Legal Entity

Egenda Ege Power Production Co.

Founded

14.03.1997

Investment Cost

128.145.931 TL/72.390.651 $

Capital

210.000.000 TL

Annual Production Capacity

127,3 GWh/Year

Installed Capacity

4455 MWm / 43,50 MWe

Facility Type

Hydroelectric (River Type)

License Acquired

27.12.2007

Location (Province/District)

Adana / Karaisalı

Commercial Operation

June 2013

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

Francis (Vertical)/Flovel

Number of Units

3 (8,5 + 2 x 17,50 Mwe)

Net Head and Flow Rate

276 m – 17,4 m3/sec

Connection Type

E-2 Substation 154 kV – 2.6 km