AKÇAY HPP / 28,78 MWe Akçay HPP Power Production Co.

Company Information

Legal Entity

Akçay HES Elektrik Production A.Ş.

Founded

10.01.2002

Investment Cost

25.523.892 TL / 16.487.557 $

Capital

26.750.000 TL

Annual Production Capacity

77 GWh / Year

Installed Capacity

31,98 MWm / 28,78 MWe

Facility Type

Hydroelectric (Channel Type)

License Acquired

24.11.2003

Location (Province/District)

Aydın / Nazilli

Commercial Operation

14 August 2009

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

Francis (Vertical) HRC

Number of Units

3 (2x11,6 MWe + 1x5,6MWe)

Net Head and Flow Rate

86,5 m - 36 m3/sec

Connection Type

DM 31.5 kV – 12.2 km