Su Energy Power Production Co.
09.03.1998
6.641.883 TL/5.050.258 $
3.000.000 TL
20,7 GWh/Year
4,5 MWe
Hydroelectric (Dammed)
05.09.2003
Balıkesir / Sındırgı
27 June 2006
Production / 49 Year
Francis (Horizontal)/Vatech
1 x 3.0 MWe + 1 x 1.6 MWe
46 m – 11,5 m3/sec
DM 34.5 kV – 4 km