ÇAYGÖREN HPP / 4.5 MWe Su Energy Power Production Co.

Company Information

Legal Entity

Su Energy Power Production Co.

Founded

09.03.1998

Investment Cost

6.641.883 TL/5.050.258 $

Capital

3.000.000 TL

Annual Production Capacity

20,7 GWh/Year

Installed Capacity

4,5 MWe

Facility Type

Hydroelectric (Dammed)

License Acquired

05.09.2003

Location (Province/District)

Balıkesir / Sındırgı

Commercial Operation

27 June 2006

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

Francis (Horizontal)/Vatech

Number of Units

1 x 3.0 MWe + 1 x 1.6 MWe

Net Head and Flow Rate

46 m – 11,5 m3/sec

Connection Type

DM 34.5 kV – 4 km